After letting the paint on the panel dry overnight, it's time to get it together and see what this all looks like. Also we're still thinking about wiring stuff - in particular, pondering what to do with all the Dynon harness wires that are now in there.
Here's the general idea behind the order that we're doing all this in, for what it's worth: it's more difficult to get into the panel from the bottom than the top, so we're sort of working bottom up, here. Now that the switches are all more or less wired, we can get the bottom row of instruments in there. When those are done (or at least farther along), we can get the top row of instruments in there. The idea here is to avoid having to wire stuff from the bottom because the stuff that's above it is in the way.
![]() Previous log entry |
![]() Back to the log |
![]() Next log entry |