Here's the plan for tonight: the alignment on the elevators isn't quite right yet - rechecking how much the rod bearings were in revealed that they all needed to be turned another turn or two. The plan is to take the elevators off (they're still on using the little temporary bolt-wanna-be nails that we made last time), and get the rod bearings in place. Then let's get the hole for the bolt drilled in each elevator, and start thinking about attaching them to the pushrods. That's the plan, anyway, let's see how we do.
Well, we've got a plan for tomorrow - first, we need to file the horizontal stab so that the clearance between the stab and the right elevator tip is back in spec. Also, we've just started working on what the plans refer to as an "aluminum sandwich" so we can drill the holes in the elevator horns for the pushrod attachment. We'll get those holes drilled tomorrow. Also, there's an elevator stop that we need to fabricate, and we need to start thinking about getting the horizontal stab bolted to the fuselage.
I expect that list of stuff will keep us busy for the next few days. Hopefully, we're not too far from having the whole empennage attached to what's beginning to look more like an aircraft and less like a canoe.
![]() Previous log entry |
![]() Back to the log |
![]() Next log entry |